Why optimizing a single component is not enough
The success of a transformation does not depend on the complexity of project management tools (PMO), but on the overall consistency of the system.
A poorly structured project inevitably creates conflicts between departments and disrupts operations. The challenge is not to follow a theoretical plan exactly as designed, but to build a flexible project architecture capable of absorbing variability and maintaining continuous alignment between strategy and operational teams.